The report starts at the object — without signing in
Every object in Custodi has its own public link for reporting damage. You generate a QR code for it and download it as a ready-made PDF showing the object and — where stored — your organization's contact details: for posting in the entrance or at the bin shed. If a posted notice ever has to be invalidated, you generate a new code; the old link then leads nowhere.
Anyone who scans the code needs no account and no app. The object the link belongs to is displayed, so nobody has to guess where they are. Required are a short description, a name, at least one photo and consent to the privacy policy. A more detailed account and the reporter's own email address are optional. Up to five photos are allowed; they are reduced in size in the browser already, so that the report gets through even with a poor connection.
So that a public link does not become an invitation for mischief, Custodi limits it: three reports per hour per link, five per internet connection. Every incoming report enters the system with priority “Medium” and without an assignee, and is marked as a public report — with the reporter's name and, if given, email address. What becomes of it is decided by the office, not by the tenant.
In the office the report is on the desk immediately
As soon as a report arrives, Custodi sends an email to your organization's stored contact address; if none is stored, it goes to the administrators. In parallel, a push notification “New damage report” with title, object and reporter goes to the office members who have enabled push notifications. Whoever entered the report themselves does not receive it — nobody needs a notification about their own input.
The second route into the same list is through the app: employees and the office record damage directly in Custodi. The app suggests the object based on the location, which avoids the most common recording error — the report on the wrong building. Priority, assignment and the “Key required” note can be added right away. If someone is assigned, that person receives an email with the report.
Handling in the field: status, effort, keys
The status of a report — “Open”, “In progress”, “Blocked”, “Completed” or “Cancelled” — is changed by the assigned person and by the office. Both can also record interim results: materials used, working time, travel time and completion photos can be entered before completion instead of reconstructing everything from memory at the end.
The object's keys are part of this. The “Key required” checkbox only says that a key is needed at all. Which ones they are you attach to the report by name — “basement door”, “bin shed” — so that the right person takes the right keys and does not have to drive out twice.
On completion, an email goes to your organization's report recipients, to the person who created the report and — if they provided an email address — to the reporter of the public report. That is the only automatic message to the reporter: Custodi does not send interim updates to tenants on its own. If you want to inform them earlier, you use the next step deliberately.
Interim report: the PDF may go out before completion
A damage report can be downloaded as a PDF or sent straight from Custodi at any time — even when it is not yet completed. Previously, sending was blocked until completion. In one case that was wrong: when the case is passed to a third party or an owner asks about it, an interim report is exactly the right document.
Instead of blocking, Custodi names the difference. Before completion, the button and dialog read “Send interim report”, a note in the dialog says so again, and the PDF itself carries “Interim report — report not yet completed” at the top. After completion it becomes the completion report. An unfinished document therefore cannot accidentally pass as final proof.
The recipients are the object's contacts — owners, property managers, customers — for whom an email address is stored; the server validates the selection against the object assignment. Your organization and the sending person receive a copy, and every dispatch is logged. It is reserved for members with the Office, Administrator or Owner role, since it is object-related correspondence.
The handover to the property manager is not a status
Some damage is not handled by your team: it belongs with the object's property manager. That is exactly what the handover in Custodi is for. It is deliberately not a status, because “handed over” and “completed” are two different statements. The report keeps its status — the work is open, it is simply no longer with you — and additionally carries the marker “Handed over to property manager”.
Nobody types in the recipient. Custodi takes the property manager stored on the object and records it on the report. If the object later changes managers, the old report keeps the recipient who was responsible at the time. If no property manager is stored yet, the dialog says so and lets you designate one of the contacts assigned to the object — that designation then applies to the whole object. A note on the handover, for example “announced by phone on Monday”, is optional.
The handover stays free of contradictions: a report that has already been handed over cannot be handed over twice, and a completed or cancelled one not at all — there is nothing left to take over there. You can withdraw it at any time; Custodi then deletes the recipient, the time and the note, and the report is back with you. And if it is completed or cancelled by you after all, the handover ends automatically instead of continuing to claim, next to a green “Completed”, that the case is with a third party.
Conclusion: one case file that still holds up months later
From the photo in the stairwell to the handover, everything stays on one record: description, photos, reporter, priority, assignment, status, effort, keys, reports sent, and the handover with recipient and time. Photos are kept as long as the report exists. Archived reports can be restored and are only deleted for good when you do so in the archive or your organization's retention period runs out — only then do the images disappear too.
The result is not an additional channel alongside WhatsApp and email, but a process with clear handover points. Your team can say at any time where a report stands, what has been done about it and — if it is no longer with you — to whom and when it was handed over.